Главная – EN

Integrated engineering solutions for the energy sector

Engineering Kazakhstan’s energy — from concept to commissioning

Power grids, renewable energy facilities, substations and 10–500 kV transmission lines. Working across Kazakhstan since 2013.

10–500 kV voltage classes WPP / SPP renewables since 2013 on the market
About us

The company in numbers

AlatauEnergoProekt covers all key design competencies for grid and renewable energy facilities: power evacuation schemes, surveys, design, expert review, construction and design supervision.

500+ MW
of wind power plant projects
600+ MW
of solar power plant projects
250+
completed projects
10–500 kV
voltage classes
1,100+
MW of renewable projects
2013
year founded
Core areas

Grid and renewable facilities

Solar power plant

SPP

Power evacuation schemes, external power supply, distribution points and grid connection support.

Learn more →
Wind farm and substation

WPP

Grid solutions, substations, overhead lines and design supervision during implementation.

Learn more →
Transmission line tower

Power lines 35–500 kV

Routing, structural design, approvals and construction support for overhead lines.

Learn more →
Substation outdoor switchgear

Substations 35–220 kV

Substations and switchgear: primary and secondary circuits, relay protection, communications and telemechanics.

Learn more →
Our services

From concept to commissioning

A single end-to-end workflow preserves the technical logic of the project — from selecting the power evacuation scheme to on-site support during implementation.

  1. 01
    Feasibility and scheme
    Connection options and calculations
  2. 02
    Surveys
    Geology, hydrology, topography
  3. 03
    Design
    Feasibility study and working documentation
  4. 04
    Expert review
    Approval support
  5. 05
    Construction
    Construction, installation and commissioning
  6. 06
    Design supervision
    On-site implementation control
Result: technically approved design documentation, ready for further implementation and grid connection of the facility.
Design experience

Key projects

All projects →
100 MW solar plant in Shu, aerial view
SPP · 100 MW

Shu SPP, Zhambyl Region

Power evacuation and 110/10 kV substation

Wind farm in Zhanatas
WPP · 100 MW

Zhanatas WPP

35 kV OHL and grid solutions

220 kV substation
WPP · 180 MW

Sastobe WPP

Connection via 220 kV OHL

Digital substation control panel
Our experience

Digital substations

Experience in developing digital substations — from a 330 kV substation design with optical current transformers to approved design requirements (STP 33240.20.117-18).

−38%
substation footprint

Digital technologies applied at the 500 kV “Tekhnologicheskaya” SS (Uzbekistan), the 330 kV “Metallurgicheskaya” SS and a number of 110 kV substations.

Why AlatauEnergoProekt

From separate sections to one power system

  1. 01Systems approach
    Every facility is treated as part of one power system
  2. 02Integrated approach
    Design, construction and design supervision
  3. 03Renewables experience
    Solar and wind plants with grid power evacuation
  4. 04Documentation base
    Licenses, OHS instructions, qualifications and support

Licenses and qualifications

  • State license for design activitiesCategory I
  • License for construction and installation worksCategory III
  • Engineering-geological and engineering-hydrological surveys
  • Field soil investigations, geophysical and topographic surveys
  • Occupational health, safety and electrical safety instructions
  • Partnership agreement for the design of nuclear power plant substationsNPP
Partnerships

Strategic partners

Minsk, Belarus · NPP substations

Belenergosetproekt

A leading design institute for power grids and power systems. The agreement covers joint design of nuclear power plant substations.

60+
years in operation
400+
employees
China · international partner

POWERCHINA

Power Construction Corporation of China — one of the world’s largest energy contractors. In Kazakhstan: Shelek WPP 60 MW, Zhanatas WPP 100 MW, Khromtau WPP 150 MW.

110+
countries with projects
104th
in Fortune Global 500
Geography: Astana Almaty Shymkent Karaganda Kyzylorda Turkestan Taraz Aktobe Atyrau Pavlodar Ust-Kamenogorsk